您好,欢迎来到济南通宇恒成自动化工程有限公司网站!

服务热线

当前位置: 首页- 新闻中心 > 公司动态
常见问题
新闻中心

电气成套使用中欠缺整体规划与标准如何

发布时间:2022-12-14 来源:http://www.tongyuhengcheng.com/ 浏览量:

电气成套使用中欠缺整体规划与标准如何?您可以对比一下,看自身在应用的电器设备存不会有这种须整顿的事项,下面小编为您讲解。
What about the lack of overall planning and standards in the use of electrical complete sets? You can compare the electrical equipment you are using to see whether there is such a thing that needs to be rectified. The following sections will explain it for you.
1、欠缺控制系统设计与整体规划
1. Lack of control system design and overall planning
①自动控制系统构造:集中化与遍布,传动系统与操纵,主控芯片与輔助,网络架构,柜身合理布局等层面均未做了整体的考虑到。
① The structure of automatic control system: centralization and pervasiveness, transmission system and control, master control chip and auxiliary, network architecture, reasonable cabinet layout and other aspects have not been considered as a whole.
②网络架构:沒有根据所明确的自动控制系统的构造,整体规划控制系统系统总线及通信网络,明确互联网的构造,传输方式,走线方式及走线间距。
② Network architecture: The control system bus and communication network were not planned as a whole according to the clear structure of the automatic control system, and the structure, transmission mode, routing mode and routing spacing of the Internet were defined.
③开关电源构造:沒有根据所明确的自动控制系统的构造,数据管理平台的开关电源分派,沒有开关电源归类按段,及其有关的维护,沒有浪涌保护器及过电流量维护。
③ Structure of switching power supply: there is no switching power supply distribution of data management platform, no switching power supply classification by segment, and its related maintenance, no surge protector and over-current maintenance according to the specified structure of automatic control system.
④接地保护:沒有根据明确的自动控制系统构造、网络架构、开关电源构造明确系统软件接地装置构造,沒有归类,按段,分层次接地装置的设计方案。
④ Grounding protection: the structure of the system software grounding device is not defined according to the clear structure of the automatic control system, network architecture and switching power supply, and the design scheme of the grounding device is not classified by sections and levels.
电气成套
2、欠缺标准与规范,及统一的管理方法
2. Lack of standards and norms, and unified management methods
①沒有统一的设计规范。
① There is no uniform design specification.
②沒有标准的制图标准。
② There is no standard drafting standard.
③沒有安裝成套设备技术标准。
③ There is no technical standard for installing the complete equipment.
④从系统软件方面,电子器件方面,各种各样型号选择都欠缺恰当与精准的测算,片面性随机性大。
④ In terms of system software and electronic components, all kinds of model choices lack proper and accurate measurement, and are highly one-sided and random.
⑤持续改善更无从说起。
⑤ There is no way to talk about continuous improvement.
电气成套使用中欠缺整体规划与标准相关内容就讲解到这里了,您对此有什么想法就来我们网站http://www.tongyuhengcheng.com咨询吧!
The lack of overall planning and standard related content in the use of electrical complete sets will be explained here. If you have any ideas about this, please come to our website http://www.tongyuhengcheng.com Consult!
首页首页 产品产品 电话电话 置顶置顶